icon_baru

Optimization of Hoisting and Luffing Wire Crane Maintenance as a Main Support For The Loading and Discharging Process of MV. PAN DAISY

Authors

  • Jerry matias sinaga

    STIP JAKARTA
    Author
  • Meilinasari N.H., S.SiT ., M.MTr

    STIP JAKARTA
    Author
  • M.Nurdin, SE.,M.M

    STIP JAKARTA
    Author

Keywords:

Hoisting and luffing wire, maintenance, loading and Discharging process, supervision.

Abstract

Abstract The purpose of this study is to determine and analyze how the ship's crew maintains the hoisting and luffing wire to obtain optimal maintenance in ensuring the loading and Discharging process on the MV.PAN DAISY operates optimally when using the ship's crane. The author uses a qualitative descriptive method to create a cause and effect approach used to describe the case that occur on the ship. On the MV. PAN DAISY the author takes a case related to the title of the study. 6 broken wires were found on the hoisting crane number 2, so the ship's party was asked to replace the wire crane immediately so that the loading and discharging process could begin, this hampered the loading and Discharging process on the MV.PAN DAISY. To ensure that the ship's crane can operate optimally, it is necessary for the crew to carry out maintenance in accordance with the PMS and carry out supervision by creating a crane running hours checklist to find out for sure the schedule for renewing the wire crane. As long as these efforts are carried out correctly, the ship's crane is always ready to be used to loading and discharging process.

Downloads

Published

2025-09-02